Detail Design Documentation Development, Procurement of Materials, Installation (Laying) of Subsea Power Cable Lines, Cable and Sensor for Subsea Part of Hydrological Monitoring System at Y.Korchagin Field | Projects of CNGS Engineering Company
ENG
РУС

Detail Design Documentation Development, Procurement of Materials, Installation (Laying) of Subsea Power Cable Lines, Cable and Sensor for Subsea Part of Hydrological Monitoring System at Y.Korchagin Field

All projects

Location:

the Caspian Sea

Type:

Subsea power and data cable lines

Scope of Works:

EPC

Year:

2017

Main Parameters:
Power cable: Hellenic 10 kV, (F)2XS(FL)2Y>c
Hydrological monitoring system cable: Real-Time Cable RS422+PWR (PDC4), 1 x 90 m, burial to 1.5 m
Videos