Detail Design Documentation Development, Procurement of Materials, Installation of Subsea Power Cables, Cables and Sensors for Subsea Parts of V.Filanovsky Field Geodynamic and Hydrological Monitoring Systems
Nov 08, 2018 г.
All projects
Location:
Caspian SeaType:
Subsea power and data cable linesScope of works:
EPCYear:
2017Main parameters: | |
---|---|
Power cable: | Nexans 10 kV, (F)2XS(FL)2Y>c |
Communication cable for hydrophones: | Real-Time Cable RS422+PWR (PDC4), 2 x 100 m, burial to 1.5 m |
Communication cable for seismographs: | Pskovcabel KG (3х1.5+4х1.0Э)-50-90 0а, 3 x 2300 m, burial to 1.5 m |