Replacement of Two Trunk Pipelines at LAM Field | Проект компании CNGS Engineering
ENG
РУС

Replacement of Two Trunk Pipelines at LAM Field

All projects

Location:

Caspian Sea

Type:

Subsea pipelines

Scope of works:

EPIC

Year:

2014

Main parameters:
Sea depth, m: 0,5-4,5
Pipelines diameter х thickness, mm 323,9 х 14,27
Type of insulation 3LPE
Design pressure 5 MPa
Product Hydrocarbon mixtures